ICD/ICS QuicK Guideline

Search for a chassis

  • Select Chassis number or Product individual number​

  • Type in the number​
    7 digits for chassis number,​
    8 digits for Product individual number.​

  • Press “Search” button​

    Or use Factory order number search ​

  • ​Select Factory order number​ search​. Type in 7 digits ​
  • Press “Search” button​
  • Click on the PI you want to us

Information:​

All your requested ICD from this application are shown in this view. ​
One row representis an ICD request for one specific chassis.​

Request a drawing

When a chassis is found, a drawing can be requested.

Select what you want to request:​
- ICD, IC3D or  “Select all”​

Press “Submit request” ​to request a drawing!​

Information:​

Upper part:

Shows details for the specific chassis:

  • ICD/ICS (request details)
  • Chassis information
  • Delivery information

Lower part:

  • Request drawing
  • Download drawings

Normal lead time:

  • A-order Drawing approximately 10 minutes
  • S-order Drawing a few days
  • ICS 10 second

Request is Ready. Download drawing

When the “Drawing request status” is “Ready” this means that the request is successful and the drawing can be downloaded.

By clicking on a request (one row in the Main page), you open the Request details page for that specific chassis. Go to "Download drawings" tab.
The requested items are marked “Ready” and green.

Download by pressing the buttons for each item.

Or “Download all files”.

Information:​

You also receive an e-mail from: Scania ICD/ICS <noreply@ext.scania.com>.

Download by pressing the ”Download ZIP-file” button.

Request support

Press the “Request support” button

Your prefered e-mail client will open

Send the e-mail to: icd-ics.support@scania.com

General Information

"Drawing Status“ - Preliminary or Definitive ​

Preliminary​
When a request is done for a PI no. or FO no. (Ch no. doesn’t exist), then the ICD and ICS are Preliminary and “Preliminary delivery date” is shown. ​
The specification of the ordered chassis can be changed. ​
“Request definitive drawing” informs the user about the earliest date to request a Definitive drawing.​

Definitive​
When a Ch no. exists then the ICD and ICS are Definitive and “Definitive delivery date” is shown.​
It is very unlikely that the specification of the chassis can be changed.​
A Definitive drawing can be requested approximately six weeks before the “Part period” (assembly of the chassis).​

Drawing request for S-order chassis

Definitive​
It takes approximately 5 working days to generate the drawing. The S-order adaptations are included in the drawing. ​
The corresponding ICS can be requested immediately.​

Preliminary​
It takes approximately 10 minutes to generate the drawing and ICS. The S-order adaptations are NOT included in the drawing.​
Only A-order specification is shown in the ICD drawing and in the ICS. ​